top of page

委員會成員及簡介

WHO WE ARE

技術顧問

圖片1.png

PHIL HEALEY

/ Founder and CEO of Active Energy Management Ltd  (2000-present)


/Fellow of IMechE, HK RPE and REA with over 30 years E&M experience


/University of Glasgow (UK) MSc. Building Services Engineering


/Coventry Polytechnic (UK) B Eng. (Hons) Combined Engineering


/Plymouth Polytechnic (UK) HND Mechanical Engineering


/European Engineer (EUR-ING) 


/UK Chartered Engineer (CEng) 

/ HK Registered Professional Engineer (RPE Mechanical)


/ HK Registered Energy Assessor (Initially Energy cum Carbon Audit)


/Certified HK Data Centre Engineer 


/Fellow of the UK Institution of Mechanical Engineers 


/ Fellow of the HK Institution of Data Centre Engineers


/ Fellow of the UK IET (Re-branded from IEE)


/Member of the UK Energy Institute


/Affiliate, Institute of Risk Management (IRM, UK)


/Associate Member, Hong Kong Green Building Council

Personal Project Responsibility Highlights:

West Kowloon Cultural District Authority - Multiple T&C Management, MEP Design Reviews, Fire & Life Safety Consultancy and FS Testing appointments 2016 on (Xiqu Theatre, M+ Museum, Palace Museum, Blackbox venue, P31/P34 Commercial Offices including sea water `District Cooling’ Plant and Tier III Data Centre.

 

 

HKJC – Numerous chiller plant T&C Management, ISO 3100 Risk and MEP Design Review assignments for new- build and lifecycle retrofits, including MEP Quality Control oversight, Closeout Management & IT Risk Management appointments 2011 to present (Sha Tin, Happy Valley, Tai Kwun and KangHua, PRC)

 

Cathay Pacific – Group Energy Reduction investigations including PV optimisation, waste-to-energy timber gasification review and refrigeration heat recovery assessment

 

Kai Tak Cruise Terminal – Lifecycle cost modelling & tariff negotiation for Kai Tak sea water cooled District Cooling Scheme.

 

HK Science & Technology Parks   Integrated Maintainability, Risk & Resilience Oversight Consultancy, TKO `Project A’ TIER III Commercial Tenant Facility + `Project C’ sea-water central chiller plant.

 

Four Seasons Hotel Hong Kong – Assessment of energy improvements for sea water condenser water pumping systems.

 

BYME – NTT Tier IV Data Centre Extension T&C Management + Asia World Expo + Ling Tong Tunnel - T&C Management

 

HUD + HUD (GES). Retained Position reporting to Divisional Director.   Contract Manager / Project Manager role for Hong Kong Electric Lamma CCGT conversion.  Responsible for contract management & closure, claims and dispute resolution and technical conclusion of multi-MW Sea Water Pump bearing failure / motor damage Issues.  Designed, managed & commissioned 11,000 Volt Shore Power Scheme for HUD’s Floating Dock & Project Managed including satisfying Lloyds Insurers.

 

Leighton Asia - PAFF Aviation Fuel Farm Tuen Mun Phases 1 & 2. Responsible for progress acceleration and commissioning control for   Fire Systems, Electrical installation, Sea Water & Aviation Fuel Pumping systems. Developed solutions to resolve pump bearing failures, developed pump sequence control strategy overcome main water deluge systems pump starting problems and resolved Aviation fuel airport pipeline flow delivery constraints affecting contractual delivery rate obligation.   Fire Services Testing to Environmental Services Dept   `STF’ Incinerator, Tuen Mun and East Kowloon Cultural Centre.

 

Cathay Pacific Cargo Terminal – Sustainability Design Planning & Implementation Oversight, T&C Management, FS testing & Radiant Ceiling Performance Trials.

 

China Harbour Engineering – FS concept design & value engineering, Environmental Services Dept, Shek Chu Shau Incinerator Tender Design

bottom of page